{"id":4841,"date":"2026-11-04T21:36:43","date_gmt":"2026-11-05T09:36:43","guid":{"rendered":"https:\/\/footworklab.net\/?p=4841"},"modified":"2026-11-04T21:36:43","modified_gmt":"2026-11-05T09:36:43","slug":"physiotherapy-equipment-list-pressure-record","status":"publish","type":"post","link":"https:\/\/footworklab.net\/es\/news\/4841\/","title":{"rendered":"Physiotherapy Equipment Lists and Where a Pressure Record Belongs on One"},"content":{"rendered":"<div class=\"fwl-author\">\n<p><strong>About the author<\/strong> \u2014 FOOTWORK LAB manufactures foot assessment equipment and custom orthotic insoles in Ruichang, Jiangxi Province, China. The company was founded in 2014 and its own plant has been producing since 2018; we are a manufacturer rather than a trading company. We hold European Union certification and ISO quality system certification, and we meet hospital and clinic buyers in person at the Canton Fair and at exhibitions in Dubai, Vietnam, Brazil and Hong Kong. <a href=\"\/our-factory\/\">See the factory<\/a> or <a href=\"\/certificate\/\">view certification<\/a>.<\/p>\n<\/div>\n<p class=\"fwl-lead\"><strong>A procurement officer for a rehabilitation department sent us their draft equipment list last year and asked a single question: where does your machine go on this?<\/strong> The list was competently made and, like most physiotherapy equipment lists, it was organised by treatment \u2014 the devices that do something to a patient filled the top, and the devices that measure something sat in a short, uncertain block near the bottom. That ordering is backwards, and not in a way that flatters us: a department that cannot record cannot evaluate what its treatment devices achieved, and the measurement line is the one that decides whether the department&#8217;s work can be compared across months. This article follows the list rather than the catalogue. It covers how assessment items earn their position on a physiotherapy equipment list, what the pressure record specifically contributes and what it never does, how the acceptance line should be written so the delivered machine is verifiably the machine that was specified, and the training line item that almost every first procurement forgets. The examples use our X3 system where a concrete machine is needed, but the logic of the list holds for any assessment purchase the department is weighing.<\/p>\n<p>One scope note before the list itself. Everything a pressure system produces is a record \u2014 angles, distributions, proportions, a video of a walk \u2014 and none of it is a diagnosis. The department&#8217;s clinicians own the interpretation; the equipment owns the record. Any acceptance line that blurs that division should be rewritten before it is signed, and the sections below show what a clean version looks like.<\/p>\n<h2>How assessment items get placed on the list in the wrong order<\/h2>\n<p>Most department lists are built in one of two ways: alphabetical by category, or sequenced by whichever supplier replied first. Both produce the same structural error \u2014 the assessment block is placed after the treatment block, as if measurement were an accessory to treatment rather than its reference frame. A better order runs: record, evaluate, treat, re-record. The assessment devices belong at the top of that chain, because everything downstream of them is judged against what they wrote down.<\/p>\n<p>The practical consequence of the wrong order is budgetary. Treatment devices are easier to specify and easier to compare, so they get procurement attention; the assessment line gets whatever remains, and departments end up with an under-specified capture system that no one trusts enough to build a programme on. In our pre-sales conversations with rehabilitation departments, the pattern repeats often enough to be a rule of thumb: the departments that buy assessment equipment well buy it first, and name it on the list before the treatment block is drafted.<\/p>\n<p>Position on the list is also a statement about workflow. An assessment item placed high signals that intake includes a record; placed low, it signals that the record is optional. Staff read the list that way even when procurement does not intend it, and eighteen months later the machine sits in the corner of the room that the list always said it would occupy.<\/p>\n<p>So the first edit we suggest to any draft list is structural, not commercial: move the assessment line above the treatment block, and give it the same specification discipline the treatment devices receive. The next section is about what that specification should contain.<\/p>\n<h2>What the pressure record line should specify<\/h2>\n<p>The pressure record earns its place on a physiotherapy equipment list by what it captures, and the specification should name the captures rather than the marketing words. For our X3 \u2014 a foot pressure and force-line detection and insole customization system \u2014 the function list is short enough to quote: foot arch detection, lower-limb biomechanical alignment detection, static foot pressure detection, dynamic gait detection, back-and-forth gait video recording, and insole customization. A specification line built on those six functions is checkable at delivery; one built on adjectives is not.<\/p>\n<p>Each capture answers a different question the department actually asks. The static record holds how load distributes in standing, which frames the weight-bearing assessment. The dynamic record holds the walking sequence \u2014 the order regions take load, how long each stays loaded, the path of the centre of pressure \u2014 which is the reference for any gait re-education work. The alignment image holds how the leg sits above the foot. The video holds the movement itself, replayable beside the numbers, which in our experience does more explanatory work with patients than any chart.<\/p>\n<p>The customization function sits at the end of the list for a reason: it is optional to the assessment role. A department can run the X3 purely as a record system, or it can use the on-site module \u2014 shaping pillows and a heating box \u2014 to end selected sessions with a build. Specifying the full set costs little and keeps both paths open; specifying only the customization and treating the records as a by-product is the one configuration we argue against, because the record is what makes the build accountable.<\/p>\n<p>What the line should also state, and rarely does, is the report&#8217;s exit path. The X3 delivers reports by scan code, by email, or as an on-site printout, and the chosen route belongs in the specification because it determines who holds the record \u2014 the patient, the department, or both. A record that only lives on the machine&#8217;s screen is a record the department cannot audit, and an acceptance test should treat it as undelivered.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/footworklab.net\/wp-content\/uploads\/2026\/11\/c0056ab70da26139c43588f3551c27d8-3.jpg\" alt=\"X3 pressure &amp; force-line system in production \u2014 FOOTWORK LAB\" loading=\"lazy\" title=\"\"><figcaption>FOOTWORK LAB X3 pressure &amp; force-line system. Product photography of our own output \u2014 specifications are confirmed in writing before an order.<\/figcaption><\/figure>\n<h2>Where the record sits beside the treatment devices<\/h2>\n<p>On a physiotherapy equipment list the pressure record shares a room with treatment devices, and the relationship between them is sequential, not competitive. The record establishes the baseline; the treatment block does its work over the following weeks; the re-record shows whether the picture moved. A department that owns both halves of that sequence can demonstrate progress in a way that neither half can alone, and the demonstration is made of comparisons, not impressions.<\/p>\n<p>The comparison is only as good as the routine behind it, which is why the specification should carry the conditions of capture alongside the captures: same stance, same pace, same number of passes, same prompts. When a re-record disagrees with the baseline, the first audit point is the procedure, not the patient \u2014 a lesson our support engineers relearn on nearly every call where a department sends two reports that look like two different people. Almost always, one operator changed something between the records and nobody wrote it down.<\/p>\n<p>The record also disciplines the treatment conversation with patients. Showing a person their own walking video beside their own pressure map turns an abstract plan into a concrete one, and the same material at follow-up turns an abstract outcome into a visible one. Treatment devices rarely produce anything a patient can look at; the record is what the patient remembers the programme by.<\/p>\n<p>What the record must never be asked to do is name the problem. Screening for gait-health purposes, including flat-foot-risk screening, describes what was seen; it does not conclude. The referral boundary \u2014 which findings belong in front of whom \u2014 belongs in the department&#8217;s protocol, not in the machine&#8217;s software, and the equipment line on the list should be written so no future reader can mistake it for a diagnostic purchase.<\/p>\n<h2>Writing the acceptance line so delivery is testable<\/h2>\n<p>The acceptance line is where a good procurement list earns its keep, and most draft lines fail a simple test: they cannot be failed. Ours is usually some version of this, adjusted to the department&#8217;s wording: on delivery, the system shall demonstrate all six specified captures on a test subject selected by the department; it shall produce a report through the specified exit route; the report shall carry the reference disclaimer; and the captured records shall be repeatable under a written routine agreed at installation. Every clause can be verified in an afternoon, which is the point of an acceptance test.<\/p>\n<p>The factory side of the line should be written into the same block. Each machine we ship runs a seven-day test before it leaves the plant, which means acceptance at the department verifies transport, installation and local procedure rather than factory quality \u2014 worth knowing, because it changes what the test is for. The equipment warranty runs twelve months against non-human damage with free parts, support runs through a dedicated group with our engineers reachable directly, remote assistance is available when a session needs eyes on the screen, and connected units receive over-the-air updates. Those are checkable commitments, and the procurement list is the place they become contractual.<\/p>\n<p>Minimum order for equipment is one unit, which sounds trivial until the list is priced: it means a department can pilot one X3 in one room before deciding whether the workflow deserves a second, rather than committing to a fleet on a specification nobody has used. We encourage the pilot structure, and the acceptance line can be written to cover the pilot explicitly \u2014 one room, one operator, one written routine, one review date.<\/p>\n<p>The acceptance line should also name the deliverables that travel with the machine: installation manual, user manual, installation toolkit, and the customization module where specified. Deliverables on the list get unpacked; deliverables assumed get discovered missing at the worst moment, which is usually the first training morning.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/footworklab.net\/wp-content\/uploads\/2026\/11\/2ea75b3068dde6b45198ac53c0086e0e.jpg\" alt=\"X3 pressure &amp; force-line system in production \u2014 FOOTWORK LAB\" loading=\"lazy\" title=\"\"><figcaption>FOOTWORK LAB X3 pressure &amp; force-line system. Product photography of our own output \u2014 specifications are confirmed in writing before an order.<\/figcaption><\/figure>\n<h2>The training line item the list always forgets<\/h2>\n<p>Between acceptance and daily use sits a gap that no specification fills by itself: the operator. Every machine leaves our plant tested, and no machine leaves it knowing the department&#8217;s routine. The list needs a training line item \u2014 who is trained, by whom, to what standard, and who the second operator is. Departments that skip the line pay for it in re-records, because an untrained rotation produces records no two of which agree.<\/p>\n<p>The second operator matters more in a hospital than anywhere else. Shifts rotate, leave happens, and a capture system that only one person can run correctly has a staffing problem built into it \u2014 the same sentence we use with retail buyers, and it lands harder in a physiotherapy department where the rota changes weekly. Naming the second operator on the list, and training them while the first one is still learning, is the cheapest line item in the whole procurement.<\/p>\n<p>Training content should cover the routine more than the buttons. The screen prompts carry the capture sequence; what they cannot carry is the department&#8217;s decisions about stance standardisation, walking pace, pass counts and the settle time before a static record. Those decisions belong in a one-page written protocol that the acceptance test references, and the training session exists to make the protocol habitual rather than theoretical.<\/p>\n<p>After installation, the support structure takes over from training: the dedicated group with our engineers, remote assistance for the questions that need the data on screen, and over-the-air updates that arrive without an engineer travelling. A department that writes the training line and the support line into the procurement list buys a workflow, not a box \u2014 and the records it produces a year later will show the difference.<\/p>\n<h2>After acceptance: what the record does in service<\/h2>\n<p>Once the machine is accepted and the operators are trained, the record goes to work, and the department should plan for three uses of it. The first is the baseline-and-recheck cycle described above, which is the clinical core. The second is the patient conversation \u2014 video and map on screen, explained by the clinician, taken home by scan code or email or printout. The third is quieter and often the most valuable: the archive, a dated series of records that becomes the department&#8217;s own evidence about its caseload and its methods.<\/p>\n<p>Where insole customization is part of the service, the record is also the specification. A build made on the X3&#8217;s on-site module is shaped against the session&#8217;s data, and the shoe check comes before the shaping \u2014 a build that will not fit the patient&#8217;s actual shoe never reaches the heating box. The record, the build and the shoe form one accountable chain, and the department that keeps the chain documented can reproduce any build it has ever made.<\/p>\n<p>The archive also serves the boundary. When a record shows something the room cannot interpret \u2014 a presentation that needs a clinical judgement beyond the department&#8217;s scope \u2014 the file is what travels with the referral. A receiving specialist receives a dated, condition-controlled record instead of a verbal impression, and the referral step that procurement never thinks to list becomes the easiest part of the workflow.<\/p>\n<p>None of this appears on the delivery day. It appears over the first year, in the department&#8217;s re-records and its archive and its referral letters, which is why the assessment line deserves its place at the top of the physiotherapy equipment list: everything the list&#8217;s treatment block achieves gets measured against what this one line wrote down.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/footworklab.net\/wp-content\/uploads\/2026\/11\/6b8342d7468e5b8965fa2bb6c14d9d55.jpg\" alt=\"X3 pressure &amp; force-line system in production \u2014 FOOTWORK LAB\" loading=\"lazy\" title=\"\"><figcaption>FOOTWORK LAB X3 pressure &amp; force-line system. Product photography of our own output \u2014 specifications are confirmed in writing before an order.<\/figcaption><\/figure>\n<h2>Frequently asked questions<\/h2>\n<div class=\"fwl-faq\">\n<h3>Where should an assessment line sit on a physiotherapy equipment list?<\/h3>\n<p>Above the treatment block. The order record, evaluate, treat, re-record makes the treatment devices accountable to a baseline, and staff read the list&#8217;s ordering as a statement about workflow. An assessment item placed last tends to end up unused; placed first, it anchors the programme.<\/p>\n<h3>What functions should the specification name for a pressure record system?<\/h3>\n<p>Name the captures: foot arch detection, lower-limb biomechanical alignment detection, static foot pressure detection, dynamic gait detection, back-and-forth gait video recording, and insole customization where the service includes it \u2014 the X3&#8217;s six-function list is a workable template. Adjectives cannot be checked at delivery; function lists can.<\/p>\n<h3>What does an acceptance test for the X3 look like?<\/h3>\n<p>On delivery, demonstrate all specified captures on a department-selected test subject, produce a report through the specified route \u2014 scan code, email or printout \u2014 confirm the report carries the reference disclaimer, and verify repeatability under the written routine agreed at installation. Every clause is verifiable in an afternoon.<\/p>\n<h3>Does the system arrive pre-tested?<\/h3>\n<p>Yes. Every unit runs a seven-day test at the plant before dispatch, so department acceptance verifies transport, installation and local procedure rather than factory quality. The warranty then covers twelve months against non-human damage with free parts.<\/p>\n<h3>Can a department pilot one unit before scaling up?<\/h3>\n<p>Yes \u2014 equipment minimum order is one unit, so a single room, a single operator and a written routine can run as a pilot with a review date before a second unit is considered. The acceptance line can be written to cover the pilot explicitly.<\/p>\n<h3>What training should the procurement list include?<\/h3>\n<p>A named first operator, a named second operator, and training that establishes the department&#8217;s written protocol \u2014 stance, pace, pass counts, settle time \u2014 rather than just the button sequence. Support afterwards runs through a dedicated group with our engineers, with remote assistance and over-the-air updates.<\/p>\n<h3>Can the equipment be used to diagnose patients?<\/h3>\n<p>No. It produces records \u2014 angles, distributions, proportions and video \u2014 and every report states that the data is for reference. Clinical interpretation and any decision about care belong to the qualified professionals in the department, and the specification should be worded so no future reader mistakes the purchase for a diagnostic one.<\/p>\n<\/div>\n<h2>What we would do next<\/h2>\n<p>Send us the draft list with the assessment block as it currently stands, and we will return a marked-up version: the specification line for the six captures, a model acceptance clause, and the training line most lists omit. If a pilot room is an option, say so \u2014 one unit, one routine, one review date is the structure we recommend most departments start with. The <a href=\"\/x3-foot-pressure-scanner\/\">X3 system page<\/a> lists the functions in the manual&#8217;s own wording.<\/p>\n<p>For how biomechanical analysis ends in a report a department can use, see <a href=\"\/news\/4259\/\">biomechanical analysis ends in a report<\/a>, and for the baseline logic behind rehabilitation programmes, <a href=\"\/news\/4107\/\">foot rehabilitation programmes need a baseline<\/a> covers the same sequencing from the clinical side. Order and warranty terms sit on the <a href=\"\/faq\/\">FAQ page<\/a>, and the <a href=\"\/contact\/\">contact page<\/a> reaches the team directly.<\/p>\n<p class=\"fwl-disclaimer\"><em>This article is intended for professional and educational reference. It is not medical advice. Foot assessment equipment produces measurements and images; clinical interpretation and any decision about care remain the responsibility of a qualified professional. Certification scope is limited to the documentation we hold: European Union certification and ISO quality system certification.<\/em><\/p>\n<div class=\"fwl-related\">\n<h2>Related reading<\/h2>\n<ul>\n<li><a href=\"\/news\/4259\/\">Biomechanical Analysis Ends in a Report<\/a><\/li>\n<li><a href=\"\/news\/4107\/\">Foot Rehabilitation Programs Need a Baseline<\/a><\/li>\n<li><a href=\"\/news\/4152\/\">Gait Physical Therapy Starts With a Record<\/a><\/li>\n<li><a href=\"\/news\/4631\/\">Pressure Plates and the F2-Pro: What the Extended Walkway Changes<\/a><\/li>\n<\/ul>\n<\/div>\n<p><script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"FAQPage\",\n  \"@id\": \"https:\/\/footworklab.net\/physiotherapy-equipment-list-pressure-record\/#faqpage\",\n  \"mainEntity\": [\n    {\"@type\": \"Question\", \"name\": \"Where should an assessment line sit on a physiotherapy equipment list?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Above the treatment block. The order record, evaluate, treat, re-record makes the treatment devices accountable to a baseline, and staff read the list's ordering as a statement about workflow. An assessment item placed last tends to end up unused; placed first, it anchors the programme.\"}},\n    {\"@type\": \"Question\", \"name\": \"What functions should the specification name for a pressure record system?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Name the captures: foot arch detection, lower-limb biomechanical alignment detection, static foot pressure detection, dynamic gait detection, back-and-forth gait video recording, and insole customization where the service includes it \u2014 the X3's six-function list is a workable template. Adjectives cannot be checked at delivery; function lists can.\"}},\n    {\"@type\": \"Question\", \"name\": \"What does an acceptance test for the X3 look like?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"On delivery, demonstrate all specified captures on a department-selected test subject, produce a report through the specified route \u2014 scan code, email or printout \u2014 confirm the report carries the reference disclaimer, and verify repeatability under the written routine agreed at installation. Every clause is verifiable in an afternoon.\"}},\n    {\"@type\": \"Question\", \"name\": \"Does the system arrive pre-tested?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Yes. Every unit runs a seven-day test at the plant before dispatch, so department acceptance verifies transport, installation and local procedure rather than factory quality. The warranty then covers twelve months against non-human damage with free parts.\"}},\n    {\"@type\": \"Question\", \"name\": \"Can a department pilot one unit before scaling up?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Yes \u2014 equipment minimum order is one unit, so a single room, a single operator and a written routine can run as a pilot with a review date before a second unit is considered. The acceptance line can be written to cover the pilot explicitly.\"}},\n    {\"@type\": \"Question\", \"name\": \"What training should the procurement list include?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"A named first operator, a named second operator, and training that establishes the department's written protocol \u2014 stance, pace, pass counts, settle time \u2014 rather than just the button sequence. Support afterwards runs through a dedicated group with our engineers, with remote assistance and over-the-air updates.\"}},\n    {\"@type\": \"Question\", \"name\": \"Can the equipment be used to diagnose patients?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"No. It produces records \u2014 angles, distributions, proportions and video \u2014 and every report states that the data is for reference. Clinical interpretation and any decision about care belong to the qualified professionals in the department, and the specification should be worded so no future reader mistakes the purchase for a diagnostic one.\"}}\n  ]\n}\n<\/script><\/p>\n<p><script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"Article\",\n  \"headline\": \"Physiotherapy Equipment Lists and Where a Pressure Record Belongs on One\",\n  \"author\": {\"@type\": \"Organization\", \"name\": \"FOOTWORK LAB\", \"url\": \"https:\/\/footworklab.net\/\"},\n  \"publisher\": {\"@type\": \"Organization\", \"name\": \"FOOTWORK LAB\", \"url\": \"https:\/\/footworklab.net\/\"},\n  \"about\": {\"@type\": \"Thing\", \"name\": \"Physiotherapy equipment list\"},\n  \"mainEntityOfPage\": \"https:\/\/footworklab.net\/physiotherapy-equipment-list-pressure-record\/\"\n}\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Procurement lists decide what a department can do for years. Where a pressure record sits among physiotherapy equipment, and how to write the acceptance line.<\/p>","protected":false},"author":1,"featured_media":4838,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[8],"tags":[],"class_list":["post-4841","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/posts\/4841","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/comments?post=4841"}],"version-history":[{"count":1,"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/posts\/4841\/revisions"}],"predecessor-version":[{"id":4842,"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/posts\/4841\/revisions\/4842"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/media\/4838"}],"wp:attachment":[{"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/media?parent=4841"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/categories?post=4841"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/tags?post=4841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}