{"id":4942,"date":"2026-11-05T21:32:18","date_gmt":"2026-11-06T09:32:18","guid":{"rendered":"https:\/\/footworklab.net\/?p=4942"},"modified":"2026-11-05T21:32:18","modified_gmt":"2026-11-06T09:32:18","slug":"customize-insole-machine-foot-scanner-one-room","status":"publish","type":"post","link":"https:\/\/footworklab.net\/es\/news\/4942\/","title":{"rendered":"Customize Insole Machine and Foot Scanner in One Room: Where the Record Becomes a Pair"},"content":{"rendered":"<div class=\"fwl-author\">\n<p><strong>About the author<\/strong> \u2014 FOOTWORK LAB manufactures foot assessment systems and runs its own orthotic insole production line at its plant in Ruichang, Jiangxi Province, China. Founded in 2014, with the plant in production since 2018, we build both the equipment and the product it feeds, and we hold European Union certification and ISO quality system certification. The production-floor questions in this article come from distributors and workshop owners met at the Canton Fair and at exhibitions in Dubai, Vietnam, Brazil and Hong Kong. <a href=\"\/our-factory\/\">See the factory<\/a> or <a href=\"\/certificate\/\">view certification<\/a>.<\/p>\n<\/div>\n<p class=\"fwl-lead\"><strong>Buyers type &#8220;customize insole machine foot scanner&#8221; into one search box, as if the two were a single purchase \u2014 and when the crate arrives, one room has to hold both the capture and the production.<\/strong> Some buyers plan it that way deliberately; others discover only at delivery that a scanner and a machine line are two jobs sharing a floor. Either way, the room changes the workflow more than the lead time: a record becomes a template the same afternoon, a pair is checked before the customer returns, and every quality question lands on a person standing metres from the bench rather than on a factory a shipment away. This article walks through what we have watched happen in rooms where capture and production sit together \u2014 how a record turns into a template, who checks the pair and signs it off, what a daily capacity of five hundred to a thousand pairs is actually for, and the points at which we tell an owner that production belongs back at the factory instead.<\/p>\n<p>First, the shape of the offer, because the search phrase hides it. The scanner side is our foot pressure detection equipment: it produces the record the insole will be built against. The production half is the FX line \u2014 the moulding and shaping benches that turn a specification into a physical pair. One machine ships at minimum order quantity one; the insole side starts at two hundred pairs, mixed across styles and sizes; the machines accept ODM development, and the insoles accept both ODM and OEM. When both sit in one room, the distance between a record and a finished pair collapses \u2014 and every section below is about what that collapse does well and where it goes wrong.<\/p>\n<h2>One room, two jobs: what actually changes<\/h2>\n<p>The obvious change is speed. A workshop that captures in the morning and moulds in the afternoon can hand a customer a finished pair inside a day, which a send-out workflow cannot match at any price. The subtler change is accountability. When the person who took the record also runs the bench, a bad capture shows up as a bad build the same day, in the same room, in front of the same operator. Nothing hides in transit. Owners who have run both workflows describe this as the real difference: send-out production blames the courier, the fitter blames the factory, and the customer waits; the one-room workflow blames nobody, because the cause is standing right there and can be looked at.<\/p>\n<p>The third change is commercial and quieter. A room that can show a record on one screen and a fresh pair on the bench sells the assessment instead of the object \u2014 the customer watches their own foot data become a product, and the appointment stops being a purchase and becomes a service. Our article on how an insole scanner sells the assessment makes this point from the retail side; in the one-room workshop it is simply the everyday scenery.<\/p>\n<p>What does not change is the boundary between measuring and deciding. The scanner produces recorded quantities \u2014 pressure distribution, arch behaviour under load, alignment angles \u2014 and the professional decides what specification those quantities justify. We do not supply equipment that converts a record into a build specification unattended, and a workshop that buys the pair of machines expecting the software to replace the fitter has bought the wrong idea along with the hardware.<\/p>\n<p>One practical consequence is worth flagging for anyone planning the layout. The two halves of the room have different rhythms: the capture side works in appointments, the bench side works in batches, and the day goes badly when both are scheduled as the same kind of time. Owners who survive their first season separate them on the calendar \u2014 sessions in the morning, moulding runs in blocks \u2014 so that neither the queue nor the bench is left half-attended. It sounds like a scheduling detail; in practice it is the difference between a workflow and two jobs fighting over one operator.<\/p>\n<h2>From record to template: the steps between a session and a build<\/h2>\n<p>A record becomes a template through a short, fixed sequence, and the workshops that run it cleanly are the ones that treat it as a procedure rather than a craft improvisation. The professional reads the session report and sets the specification: which areas need support, where cushioning is raised or trimmed, what the structural layer has to do. The specification is written onto the build sheet in the workshop&#8217;s own notation \u2014 because a template that exists only in someone&#8217;s head cannot survive a staff change.<\/p>\n<p>The bench work follows: heat, mould against the form, trim to the shoe, and mark. Every pair carries its record&#8217;s name, and the name carries the date, because a remake requested six months later has to start from a known capture rather than from memory. At our Ruichang plant the same discipline runs at line scale \u2014 the file follows the pair down the line \u2014 and it is the first thing we teach a workshop that is adding a machine behind its scanner.<\/p>\n<p>On one visit to a distributor&#8217;s workshop after a Hong Kong exhibition, the owner showed us his remake rate before and after he started writing specifications down: the drop was immediate, and he was slightly embarrassed about the years spent treating moulding as a personal skill rather than a repeatable process. The bench rewards temperament less than it rewards order. The scanner supplies the record; the template supplies the memory; the fitter still supplies the judgement.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/footworklab.net\/wp-content\/uploads\/2026\/11\/3a4d47b991ae12b52b7aa9fd84d1e309.jpg\" alt=\"FX insole production line in production \u2014 FOOTWORK LAB\" loading=\"lazy\" title=\"\"><figcaption>FOOTWORK LAB FX insole production line. Product photography of our own output \u2014 specifications are confirmed in writing before an order.<\/figcaption><\/figure>\n<h2>Who checks the pair: quality control belongs to a person<\/h2>\n<p>Every pair passes through someone&#8217;s hands before it passes through the customer&#8217;s shoe, and the one-room workflow makes that check harder rather than easier, for one specific reason: proximity. The pair that came off the bench five minutes ago looks finished. The send-out workflow forces a pause \u2014 the pair arrives, someone opens the box, someone compares it against the order. The one-room workflow has to recreate that pause deliberately, or it silently disappears.<\/p>\n<p>So the check gets an owner and a list. The owner is named, and it is not always the person who moulded the pair \u2014 a second pair of eyes catches what the maker&#8217;s eyes smooth over. The list is short and physical: does the build match the specification sheet; does it sit flat in the shoe it was made for; are the edges trimmed clean; does the marked name match the record. A pair that fails any line goes back to the bench with the reason written down, because a remake whose cause is not recorded is a remake waiting to be repeated.<\/p>\n<p>We keep saying in our training sessions that the check is where the workshop&#8217;s reputation actually lives. The scanner earns the customer&#8217;s trust in the session; the pair keeps it in the shoe. A workshop that treats quality control as a formality is spending the trust the first half of the workflow built, and the complaints arrive later as remake requests with no diagnosis of what went wrong.<\/p>\n<h2>The capacity question: what five hundred to a thousand pairs a day is for<\/h2>\n<p>The FX line&#8217;s daily capacity runs at roughly five hundred to a thousand pairs, and the number gets misread more often than any other figure in our catalogue. It is a factory figure. It describes what the line produces at our own plant, running full days with trained operators and material flow arranged around it. A workshop room does not reproduce those conditions, and an owner who buys the line expecting the catalogue number on day one has confused the capacity of a system with the capacity of a schedule.<\/p>\n<p>What the number is honestly for: headroom. A workshop running a few dozen pairs a week uses a small fraction of what the line can do, and that gap is not waste \u2014 it is the room to take a busy season, a wholesale order from a neighbouring retailer, or a brand programme without re-planning the workflow. The capacity figure also sets the honest ceiling for growth plans: when a workshop&#8217;s orders start pressing against what one room&#8217;s staffing can feed the bench, the answer is a second operator or a second shift long before it is a second machine.<\/p>\n<p>When we talk with distributors at the Canton Fair, the owners who are happy with their lines are almost never the ones who bought on the capacity number. They are the ones who bought for the workflow \u2014 capture, build, check, deliver under one roof \u2014 and discovered the capacity later, when a wholesale enquiry made it relevant. The number matters when you need it; the workflow matters from the first week.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/footworklab.net\/wp-content\/uploads\/2026\/11\/e615f12a685f72842735ea9081af1117.jpg\" alt=\"FX insole production line in production \u2014 FOOTWORK LAB\" loading=\"lazy\" title=\"\"><figcaption>FOOTWORK LAB FX insole production line. Product photography of our own output \u2014 specifications are confirmed in writing before an order.<\/figcaption><\/figure>\n<h2>Rework and returns: where the room&#8217;s responsibility ends<\/h2>\n<p>Every production workflow makes pairs that come back, and the one-room workflow&#8217;s advantage is that it can learn from them at the bench where they were made. A pair returned for looseness, edge discomfort or early loss of shape gets examined against its own record: was the capture rushed, was the specification misread, was the moulding heat or timing off, did the shoe change after the fitting. The answer decides whether the fix is a trim, a rebuild or a recapture \u2014 and whether the record itself needs a note in the file.<\/p>\n<p>The honest accounting matters as much as the fix. A workshop that absorbs every remake silently never finds out whether its problem is capture quality, bench technique or shoe selection. We ask owners to log remakes with a cause line, the way plant QC does, because the pattern in the log is the only thing that can tell the difference between a fitter who needs refresher training and a capture corner whose lighting has drifted. In our own factory the remake log is a standing management document; a workshop&#8217;s version can be a notebook page and still do the same job.<\/p>\n<p>Where responsibility ends is a line we draw plainly. The room owns the capture it took and the build it made. What it does not own is a build made against a specification the professional approved and a record the equipment captured faithfully, wearing out early because the customer&#8217;s workload or shoe changed. That is wear, not defect, and a workshop that treats every worn pair as a remake debt will drown in goodwill work. The conversation with the customer at fitting \u2014 what the build is for, what shortens its life \u2014 is what keeps that line visible later.<\/p>\n<h2>When production belongs back at the factory<\/h2>\n<p>There is a scale at which the one-room arrangement stops making sense, and we name it to owners before they grow into the problem. When orders are wholesale \u2014 two hundred pairs at a time, mixed across styles and sizes for a retail chain or a brand programme \u2014 the economics belong at the plant. Material flow, operator specialisation, moulding consistency across hundreds of pairs: these are what a factory floor does that a workshop room cannot, at any level of staff dedication.<\/p>\n<p>The tell-tale signs are operational before they are financial. A bench that never cools. A second operator hired mainly to feed the first. Remake rates creeping up as volume rises, because the check step is being compressed to keep up. Owners who see two of these usually have a factory conversation to have, and the good news is that it does not undo the workflow: the scanner keeps earning in the room, capture stays local, and production moves to where the capacity already exists. Many of our best distributor arrangements run exactly this split \u2014 workshop-side capture, factory-side production, MOQ two hundred pairs mixed as needed.<\/p>\n<p>Two things we do not do belong in this closing section, because the one-room arrangement tempts both. We do not promise regional exclusivity to workshops running a line, because the promise we can keep is about the equipment, the material and the delivery \u2014 not about who else may sell in a city. And we do not pretend the room replaces the factory: the plant with its daily capacity, its seven-day unit testing and its twelve-month machine warranty exists precisely so the workshop can send wholesale scale back up the chain instead of breaking its own workflow trying to hold it.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/footworklab.net\/wp-content\/uploads\/2026\/11\/5e613d0524876ed277b2493d2857afac-1.jpg\" alt=\"FX insole production line in production \u2014 FOOTWORK LAB\" loading=\"lazy\" title=\"\"><figcaption>FOOTWORK LAB FX insole production line. Product photography of our own output \u2014 specifications are confirmed in writing before an order.<\/figcaption><\/figure>\n<h2>Frequently asked questions<\/h2>\n<div class=\"fwl-faq\">\n<h3>Does one machine and one scanner really fit in a single room?<\/h3>\n<p>Physically, yes \u2014 the bench footprint and the capture corner both fit in a normal workshop room, and many owners run exactly that layout. The honest question is operational: whether one or two named operators can run capture, moulding and quality checks without compressing the check step when the queue is long.<\/p>\n<h3>How does a scanner record become a build template?<\/h3>\n<p>The professional reads the session report and writes the specification \u2014 where support sits, where cushioning is raised or trimmed \u2014 onto a build sheet. The bench then heats, moulds, trims and marks the pair against that sheet, with the record&#8217;s name and date carried on the build. The specification is written down because a template that lives only in the fitter&#8217;s head cannot survive a staff change.<\/p>\n<h3>Who should do the quality check on each pair?<\/h3>\n<p>A named person, ideally not the one who moulded the pair, working from a short physical list: build matches the specification sheet, sits flat in the shoe it was made for, edges trimmed clean, name matches the record. A failed pair goes back to the bench with the reason written down, so the cause can be fixed rather than repeated.<\/p>\n<h3>Is the daily capacity figure what a workshop will produce?<\/h3>\n<p>No. Roughly five hundred to a thousand pairs a day is what the line produces at the factory, with trained operators and arranged material flow across full days. A workshop uses a fraction of that, which is fine \u2014 the number is headroom for busy seasons and wholesale orders, not a day-one target.<\/p>\n<h3>When does production make sense at the factory instead of in the room?<\/h3>\n<p>When orders turn wholesale \u2014 pairs in the hundreds, mixed across styles and sizes. Factory-scale material flow and operator specialisation hold consistency across large runs in a way one room cannot. The scanner keeps earning in the workshop either way; production moves up the chain, with a two-hundred-pair minimum mixing freely.<\/p>\n<h3>How should remakes be handled in a one-room workflow?<\/h3>\n<p>Examined against the pair&#8217;s own record: capture quality, specification reading, bench technique, or a changed shoe and workload. The cause gets logged, the fix follows the cause \u2014 trim, rebuild or recapture \u2014 and wear from use is treated as wear, not as a remake debt, provided the fitting conversation set expectations at the start.<\/p>\n<h3>Can the machines and insoles carry our own brand?<\/h3>\n<p>The insoles accept ODM and OEM development, so a branded programme is straightforward \u2014 raise it at enquiry so marking and packaging are built in. The machines accept ODM development, and machine OEM arrangements are discussed case by case, which is worth doing before the order rather than after.<\/p>\n<\/div>\n<h2>What we would do next<\/h2>\n<p>If you are weighing a room against a factory arrangement, draw your week first: how many captures, how many pairs, who checks, who moulds, what happens on the busiest day. Send that through the <a href=\"\/contact\/\">contact page<\/a> and we will tell you honestly where the line between the room and the plant falls for your numbers. The <a href=\"\/insole-categories\/\">insole categories page<\/a> shows the product range the line feeds, and the <a href=\"\/faq\/\">FAQ page<\/a> carries the order minimums, sample and delivery terms.<\/p>\n<p>For the workflow&#8217;s two halves in detail, read <a href=\"\/news\/4147\/\">a custom insole machine line from the inside<\/a> and <a href=\"\/news\/4558\/\">a fit insole machine still needs a fitter<\/a>; for the scale question from both directions, <a href=\"\/news\/4287\/\">in-house production or a factory partner<\/a> and <a href=\"\/news\/4693\/\">your first orthotic insole making machine<\/a> cover the decision end to end.<\/p>\n<p class=\"fwl-disclaimer\"><em>This article is intended for professional and educational reference. It is not medical advice. Foot assessment equipment produces measurements and images; clinical interpretation and any decision about care remain the responsibility of a qualified professional. Certification scope is limited to the documentation we hold: European Union certification and ISO quality system certification.<\/em><\/p>\n<div class=\"fwl-related\">\n<h2>Related reading<\/h2>\n<ul>\n<li><a href=\"\/news\/4147\/\">A Custom Insole Machine Line From the Inside<\/a><\/li>\n<li><a href=\"\/news\/4558\/\">A Fit Insole Machine Still Needs a Fitter<\/a><\/li>\n<li><a href=\"\/news\/4287\/\">In-House or Factory<\/a><\/li>\n<li><a href=\"\/news\/4693\/\">Your First Orthotic Insole Making Machine<\/a><\/li>\n<\/ul>\n<\/div>\n<p><script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"FAQPage\",\n  \"@id\": \"https:\/\/footworklab.net\/customize-insole-machine-foot-scanner-one-room\/#faqpage\",\n  \"mainEntity\": [\n    {\"@type\": \"Question\", \"name\": \"Does one machine and one scanner really fit in a single room?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Physically, yes \u2014 the bench footprint and the capture corner both fit in a normal workshop room. The honest question is operational: whether named operators can run capture, moulding and quality checks without compressing the check step when the queue is long.\"}},\n    {\"@type\": \"Question\", \"name\": \"How does a scanner record become a build template?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The professional reads the session report and writes the specification onto a build sheet. The bench then heats, moulds, trims and marks the pair against that sheet, with the record's name and date carried on the build. The specification is written down so it survives a staff change.\"}},\n    {\"@type\": \"Question\", \"name\": \"Who should do the quality check on each pair?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"A named person, ideally not the one who moulded the pair, working from a short physical list: build matches the specification sheet, sits flat in the shoe, edges trimmed clean, name matches the record. Failures go back to the bench with the reason written down.\"}},\n    {\"@type\": \"Question\", \"name\": \"Is the daily capacity figure what a workshop will produce?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"No. Roughly five hundred to a thousand pairs a day is what the line produces at the factory with trained operators and arranged material flow. A workshop uses a fraction of that \u2014 the number is headroom, not a day-one target.\"}},\n    {\"@type\": \"Question\", \"name\": \"When does production make sense at the factory instead of in the room?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"When orders turn wholesale \u2014 pairs in the hundreds, mixed across styles and sizes. Factory-scale material flow holds consistency across large runs in a way one room cannot. The scanner keeps earning in the workshop; production moves up the chain.\"}},\n    {\"@type\": \"Question\", \"name\": \"How should remakes be handled in a one-room workflow?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Examined against the pair's own record: capture quality, specification reading, bench technique, or a changed shoe and workload. The cause gets logged and the fix follows the cause. Wear from use is wear, not a remake debt, provided expectations were set at fitting.\"}},\n    {\"@type\": \"Question\", \"name\": \"Can the machines and insoles carry our own brand?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The insoles accept ODM and OEM development, so a branded programme is straightforward \u2014 raise it at enquiry so marking and packaging are built in. Machines accept ODM development, and machine OEM arrangements are discussed case by case.\"}}\n  ]\n}\n<\/script><\/p>\n<p><script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"Article\",\n  \"headline\": \"Customize Insole Machine and Foot Scanner in One Room: Where the Record Becomes a Pair\",\n  \"author\": {\"@type\": \"Organization\", \"name\": \"FOOTWORK LAB\", \"url\": \"https:\/\/footworklab.net\/\"},\n  \"publisher\": {\"@type\": \"Organization\", \"name\": \"FOOTWORK LAB\", \"url\": \"https:\/\/footworklab.net\/\"},\n  \"about\": {\"@type\": \"Thing\", \"name\": \"customize insole machine foot scanner\"},\n  \"mainEntityOfPage\": \"https:\/\/footworklab.net\/customize-insole-machine-foot-scanner-one-room\/\"\n}\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Capture and production in the same room change the workflow, not just the lead time. How a record becomes a template, who checks the pair, and when production belongs back at the factory.<\/p>","protected":false},"author":1,"featured_media":4939,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[8],"tags":[],"class_list":["post-4942","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/posts\/4942","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/comments?post=4942"}],"version-history":[{"count":1,"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/posts\/4942\/revisions"}],"predecessor-version":[{"id":4943,"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/posts\/4942\/revisions\/4943"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/media\/4939"}],"wp:attachment":[{"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/media?parent=4942"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/categories?post=4942"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/footworklab.net\/es\/wp-json\/wp\/v2\/tags?post=4942"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}