{"id":4740,"date":"2026-11-03T15:29:21","date_gmt":"2026-11-04T03:29:21","guid":{"rendered":"https:\/\/footworklab.net\/?p=4740"},"modified":"2026-11-03T15:29:21","modified_gmt":"2026-11-04T03:29:21","slug":"foot-scan-device-mobile-route","status":"publish","type":"post","link":"https:\/\/footworklab.net\/fr\/news\/4740\/","title":{"rendered":"A Foot Scan Device That Works Out of a Van: Running FMP Sessions on a Community Route"},"content":{"rendered":"<div class=\"fwl-author\">\n<p><strong>About the author<\/strong> \u2014 FOOTWORK LAB is a manufacturer of foot assessment equipment and custom orthotic insoles, based in Ruichang, Jiangxi Province, China. Founded in 2014, with its own production plant in operation since 2018 \u2014 we are the factory, not a trading company. We hold European Union certification and ISO quality system certification, and since our first Canton Fair we have shown our systems at industry events in Dubai, Vietnam, Brazil and Hong Kong, sitting down with clinic owners, footwear retailers and distributors face to face. <a href=\"\/our-factory\/\">See the factory<\/a> or <a href=\"\/certificate\/\">view certification<\/a>.<\/p>\n<\/div>\n<p class=\"fwl-lead\"><strong>The van is half on the pavement outside a community hall, and the caretaker is still looking for the right key. In the case: a pressure plate, two cameras on brackets, a hub, a heating box, a floor mat and a set of shaping pillows. In the hall: forty stackable chairs, a badminton line under the varnish, and one socket near the kitchen door.<\/strong> By nine the first person will be taking off their shoes. Whether the morning works is not settled by the case \u2014 the case answers the portability question on its own \u2014 but by whether the same measurements can be taken in a room nobody has measured before. Most buyers who type <strong>foot scan device<\/strong> are shown a fixed installation in a clinic room with a door that closes. This article is about the other version: a capture-and-customise set that arrives, runs a session that can be compared with the last one, and is packed away before the hall is needed for badminton. What travels, what the room has to provide, how set-up time turns into capacity, how a two-site day is scheduled, and how a pair of insoles gets finished without a workshop \u2014 in that order.<\/p>\n<p>The system is the FMP: static, dynamic and balance pressure records, full-body biomechanical alignment through two cameras, and a module for building insoles on site. That combination is what makes a route possible in the first place. A plate alone would screen people and send them elsewhere; a build bench alone would have nothing to build from. Held together, the two halves fit into one visit, which is the only unit of time a community route can sell.<\/p>\n<h2>What comes out of the case, and why the list matters<\/h2>\n<p>The packing list is short enough to memorise: the pressure plate, two cameras with their brackets, a hub, a heating box, a floor mat, shaping pillows in adult and child sizes with auxiliary pieces, and the case itself. Read as inventory, it is a kit. Read as conditions, it is a specification of the room \u2014 because every item on that list needs something from the building that the building may not have.<\/p>\n<p>The plate needs a floor that does not move. The cameras need a clear sightline at the right height and a few steps of open floor in front of them. The heating box needs a circuit that can carry it and enough time to reach temperature before the first build. The pillows need a surface at working height, which in practice means a table, because shaping bent over a chair is a job that produces a different result by the fourth person of the day.<\/p>\n<p>Three subsystems, three different requirements, one case. That is the honest definition of portable: not light, not small, but divisible into parts that can each be satisfied by an ordinary room. A single integrated cabinet would be easier to wheel and much harder to place. The trade was made deliberately, and it is the reason the system turns up in village halls rather than only in buildings designed around it.<\/p>\n<p>One clarification belongs here, because the search term pulls in two different products. The FMP is not a shape-capture device. It records load under the foot and the alignment of the body above it; there is no surface model of the sole at the end of a session and no geometry file to send to a milling bench. Buyers who need a shell shape are looking at another category, and we say so in the first exchange rather than the third.<\/p>\n<h2>Three checks in the room before anything is switched on<\/h2>\n<p>The first is the floor. A plate that rocks, or that sits on a carpet with a soft underlay, records something other than the person standing on it. Old sports halls are usually good \u2014 varnished boards over a solid base \u2014 while converted community rooms with laminate over screed can flex. The test takes a minute: stand on the plate, shift weight from heel to forefoot, and watch whether the picture moves in a way the body did not.<\/p>\n<p>The second is light. The cameras want even, indirect illumination. A window directly behind the participant turns them into a silhouette, and a glass door in a south-facing wall will move a patch of hard sunlight across the floor between the first and the fifth appointment. Closing a blind or turning the mat through a quarter turn usually solves it. What does not solve it is adjusting the camera until the outline appears, then discovering at the next venue that the same adjustment is wrong.<\/p>\n<p>The third is the run-up. A person needs a clear line of a few steps on the approach and a clear line off the plate, with nothing in the walking path \u2014 no chair stack, no queue, no table leg. In a hall this usually means the side aisle rather than the middle of the floor, partly for the space and partly because a queue standing behind the plate changes how people walk onto it.<\/p>\n<p>We once set a system up on a low stage because the stage was the only flat area, and spent the morning watching people climb two steps, pause, and start walking from a standing position. The records were unusable and the fault was ours. The floor at the front of the stage was level enough; we simply had not looked at it first.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/footworklab.net\/wp-content\/uploads\/2026\/10\/cc9fcee785970afcf13957ced76a8b1b-4.jpg\" alt=\"FMP pressure &amp; posture customization system in use - FOOTWORK LAB\" loading=\"lazy\" title=\"\"><figcaption>FOOTWORK LAB FMP pressure &amp; posture customization system. Measurement records only &#8211; clinical interpretation remains a professional judgement.<\/figcaption><\/figure>\n<h2>Power, warm-up, and the quarter of an hour nobody budgets for<\/h2>\n<p>A hall will usually offer one double socket, positioned for a vacuum cleaner rather than for equipment. Everything in the set can run from a single circuit, but the circuit has to be checked for what else is on it. An urn, a heater or a catering fridge on the same ring will not stop the plate, and it may interrupt the heating box halfway through a build \u2014 the kind of failure that looks like a fault and is actually a plug.<\/p>\n<p>Timing then becomes the discipline of the morning. The heating box goes on before the plate, because it is the slowest item to become useful and the first build of the day is usually the appointment that was hardest to book. The plate and the cameras want their own settling time: boot the software, log in, check that both camera feeds are live, and run one pass with a colleague before the door opens.<\/p>\n<p>That test pass is not a formality. It gives the operator a known foot on the screen at the start of the day, which is the only way to notice that a camera has been knocked in transit or that a mat has been laid over the cable run. It also sets the habit for the room: the first person through the door should never be the calibration run.<\/p>\n<p>What we do not do is troubleshoot a venue over the phone. Updates reach connected units over the air and should be applied the night before a route, not in a hall with one bar of signal. Where something does go wrong on site, the answer comes from the engineer in the WhatsApp group and from the spare parts in the van \u2014 which is an argument for carrying the small items that fail, not for carrying a second system.<\/p>\n<h2>Set-up time is the real capacity limit<\/h2>\n<p>Capacity on a route is arithmetic, and the arithmetic is unkind. A session of twenty-five minutes with a five-minute changeover gives a ceiling set by the clock, not by the equipment; add forty minutes at each end and the same day holds fewer people than the operator promised. This is why we ask buyers to time their own set-up before they publish a price list, and to time the pack-down separately, because pack-down is always slower than it looks at four in the afternoon.<\/p>\n<p>The fixes are unglamorous. Cables get labelled at both ends and coiled the same way every time. The case is packed in the reverse order of unpacking, so the plate comes out last and goes in first. A layout diagram \u2014 plate here, camera stands there, chair at this angle \u2014 is taped inside the lid, and the same diagram is photographed on a phone so that a second operator can rebuild the room without a conversation.<\/p>\n<p>The larger fix is ownership. When two people set up, the plate ends up in a slightly different place and the camera height changes by a hand&#8217;s width, and the records from the two halves of the day are no longer quite comparable. One person owns the layout even when two people carry the boxes. The second person carries, fetches water, and talks to the queue.<\/p>\n<p>None of this appears in a specification sheet, and all of it decides whether a mobile programme survives its first month. A system that takes an hour to rebuild is a system that stays in the van. The hardware is capable of being moved; the routine is what makes moving it worth doing.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/footworklab.net\/wp-content\/uploads\/2026\/10\/7e9df956797ffcc048634a7bf429fe0b-24.jpg\" alt=\"FMP pressure &amp; posture customization system in use - FOOTWORK LAB\" loading=\"lazy\" title=\"\"><figcaption>FOOTWORK LAB FMP pressure &amp; posture customization system. Measurement records only &#8211; clinical interpretation remains a professional judgement.<\/figcaption><\/figure>\n<h2>Two sites in one day: what the route has to survive<\/h2>\n<p>The plan that looks efficient on paper is a morning in one town and an afternoon in another, forty minutes apart. On the ground it is a load-out, a drive, a search for parking, a carry up a step and along a corridor, and a second set-up that starts forty minutes late because the first hall was locked at the agreed time. Two sites in a day is possible; two sites with a long carry at each end is usually a way of delivering one good session and one rushed one.<\/p>\n<p>So the booking questions are practical. How far is the parking from the door, and is there a kerb? Is there a lift, and does the case fit in it? How many doors between the entrance and the room, and do any of them lock? A venue that answers those four questions in advance is worth more to a route than a venue with better footfall.<\/p>\n<p>The order of the day follows the work. The site with a build queue goes first, while the heating box has a full morning ahead of it and the operator is fresh; the screening-only site goes second, where a standing and walking record plus a short conversation is the whole appointment. Reversing that order means heating a box for one pair at four in the afternoon, which is a poor use of the last hour.<\/p>\n<p>Weather is part of the schedule in a way that clinic work never is. Rain brings wet floors and wet shoes, and a wet shoe on a plate is a different record from a dry one. A mat inside the door, a place for coats that is not the plate, and a spare towel in the case cover most of it. In winter, the first appointment of the morning often arrives in boots and changes into the shoes they were told to bring; the change is part of the session, not an interruption to it.<\/p>\n<h2>From a standing record to a pair of insoles in a hall<\/h2>\n<p>The sequence inside an appointment does not change because the room did. Standing pass, walking pass, balance pass, with the cameras recording alignment throughout. The operator reads the screen with the person beside them rather than turning it away, because the record is easier to accept when it is being explained. Then the build is chosen from what the record shows and from the shoe the person actually wears.<\/p>\n<p>The bench is the part that a hall does not provide. A folding table at working height, close to the socket, out of the walking line, with a stool that puts the operator&#8217;s hands above the shell rather than below it. Trimming and fitting are quiet work and should not happen in front of the queue; in a small room that means turning the table so the queue sees the screen and not the knife.<\/p>\n<p>The shoe rule holds wherever the session happens: where the record and the shoe disagree, the shoe wins. A build that cannot sit inside the last is a build that stays in the box. This is why we ask people to bring the shoes they wear most, and why a route that serves a farming community and a route that serves an office park end up carrying different builds for the same kind of record.<\/p>\n<p>What the person leaves with is a printed summary, a digital copy by code or email where the venue has signal, and a pair fitted in their own shoes. What they do not leave with is a diagnosis. The system records pressure and alignment; the reading of that record, and any decision about care, belongs to the qualified person running the session. On a mobile route that boundary needs saying out loud more often than in a clinic, because the setting invites people to ask for more than the equipment can honestly give.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/footworklab.net\/wp-content\/uploads\/2026\/10\/7e9df956797ffcc048634a7bf429fe0b-25.jpg\" alt=\"FMP pressure &amp; posture customization system in use - FOOTWORK LAB\" loading=\"lazy\" title=\"\"><figcaption>FOOTWORK LAB FMP pressure &amp; posture customization system. Measurement records only &#8211; clinical interpretation remains a professional judgement.<\/figcaption><\/figure>\n<h2>Frequently asked questions<\/h2>\n<div class=\"fwl-faq\">\n<h3>Does the FMP produce a scan of the foot&#8217;s shape?<\/h3>\n<p>No. It records plantar pressure in standing, walking and balance states, plus the alignment of the body above the foot through two cameras. No surface model or geometry file of the sole is produced. Buyers who need a shape file for a shell are looking at a different capture category, and we say so before quoting.<\/p>\n<h3>How long does it take to set up in a room the operator has never seen?<\/h3>\n<p>Longer than the second visit, and that difference is the number worth measuring. A first set-up includes finding the level patch, checking the light, running the cables safely and testing both camera feeds; the same room on the fifth visit is a routine. We ask buyers to time their own first and fifth set-ups rather than accept a figure from a brochure.<\/p>\n<h3>What does the set need from the venue&#8217;s power supply?<\/h3>\n<p>One circuit is enough for the whole set, but the circuit has to be checked for what else shares it. The heating box is the heaviest draw and the one that suffers first when a kettle or a heater is on the same ring. A long extension lead is part of the kit; a lead taped across a walking line is not.<\/p>\n<h3>Can one operator run a route alone?<\/h3>\n<p>For screening appointments, yes \u2014 the capture and the conversation are a single-person job. For a day with a build queue, no. Carrying, shaping, trimming and fitting overlap, and a solo operator either delays the queue or rushes the build. Two people, or one person plus a host from the venue, is the practical minimum.<\/p>\n<h3>What happens when the floor is not level?<\/h3>\n<p>Move the capture point. Packing under a plate changes what the plate records, so levelling with card or cloth is a last resort and should be noted in the session log if it is used at all. Halls usually have one good patch \u2014 often the aisle or the area in front of the stage \u2014 and finding it is part of the first visit.<\/p>\n<h3>Does the system need an internet connection on site?<\/h3>\n<p>Capture runs without one. A connection helps for sharing reports by code or email, and it is needed for over-the-air updates, which belong the night before a route rather than in a hall with weak signal. Where a venue has no coverage, printed summaries and a follow-up message from the office cover the gap.<\/p>\n<h3>How many appointments fit into a day?<\/h3>\n<p>The ceiling is set by changeover, not by the device. A short standing-and-walking appointment with a few minutes of cleaning and reset between people allows more of them than a build appointment, which has heating and trimming inside it. Most routes we hear about run a mixed day and book the builds in the morning.<\/p>\n<\/div>\n<h2>What we would do next<\/h2>\n<p>Send us the room before you send us the order. A photograph of the floor, the position of the sockets and the distance from the door to the likely capture point tells us more than a description, and it is enough to mark up a layout that a second operator can rebuild without you. If the route is already running, send the timetable instead and we will say where the changeover is eating the day.<\/p>\n<p>We do not quote prices in articles, and we do not plan a route around a venue we have not seen. What we will do is go through the packing list item by item against your rooms, tell you which parts of the set your venues can support and which they cannot, and be direct when a fixed installation would serve you better than a mobile one. The <a href=\"\/f2-fmp-gait-scanner\/\">FMP system page<\/a> lists the functions in the manual&#8217;s own wording; the <a href=\"\/contact\/\">contact page<\/a> reaches the team directly, and the <a href=\"\/faq\/\">FAQ<\/a> carries order, warranty and transit terms in full.<\/p>\n<p class=\"fwl-disclaimer\"><em>This article is intended for professional and educational reference. It is not medical advice. Foot assessment equipment produces measurements and images; clinical interpretation and any decision about care remain the responsibility of a qualified professional. Certification scope is limited to the documentation we hold: European Union certification and ISO quality system certification.<\/em><\/p>\n<div class=\"fwl-related\">\n<h2>Related reading<\/h2>\n<ul>\n<li><a href=\"\/news\/4651\/\">A Foot Pressure Plate That Travels<\/a><\/li>\n<li><a href=\"\/news\/4323\/\">Foot Assessment Is a Session, Not a Device<\/a><\/li>\n<li><a href=\"\/news\/4307\/\">Foot Gait Floor Mat vs Fixed Platform<\/a><\/li>\n<li><a href=\"\/news\/4291\/\">Fitting a Foot Scanner Into a Shoe Shop<\/a><\/li>\n<\/ul>\n<\/div>\n<p><script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"FAQPage\",\n  \"@id\": \"https:\/\/footworklab.net\/foot-scan-device-mobile-route\/#faqpage\",\n  \"mainEntity\": [\n    {\"@type\": \"Question\", \"name\": \"Does the FMP produce a scan of the foot's shape?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"No. It records plantar pressure in standing, walking and balance states, plus the alignment of the body above the foot through two cameras. No surface model or geometry file of the sole is produced. Buyers who need a shape file for a shell are looking at a different capture category.\"}},\n    {\"@type\": \"Question\", \"name\": \"How long does it take to set up in a room the operator has never seen?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Longer than the second visit, and that difference is the number worth measuring. A first set-up includes finding the level patch, checking the light, running the cables safely and testing both camera feeds; the same room on the fifth visit is a routine.\"}},\n    {\"@type\": \"Question\", \"name\": \"What does the set need from the venue's power supply?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"One circuit is enough for the whole set, but the circuit has to be checked for what else shares it. The heating box is the heaviest draw and the one that suffers first when a kettle or a heater is on the same ring.\"}},\n    {\"@type\": \"Question\", \"name\": \"Can one operator run a route alone?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"For screening appointments, yes. For a day with a build queue, no. Carrying, shaping, trimming and fitting overlap, so two people, or one person plus a host from the venue, is the practical minimum.\"}},\n    {\"@type\": \"Question\", \"name\": \"What happens when the floor is not level?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Move the capture point. Packing under a plate changes what the plate records, so levelling with card or cloth is a last resort and should be noted in the session log if it is used at all.\"}},\n    {\"@type\": \"Question\", \"name\": \"Does the system need an internet connection on site?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Capture runs without one. A connection helps for sharing reports by code or email and is needed for over-the-air updates, which belong the night before a route rather than in a hall with weak signal.\"}},\n    {\"@type\": \"Question\", \"name\": \"How many appointments fit into a day?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The ceiling is set by changeover, not by the device. A short standing-and-walking appointment allows more of them than a build appointment, which has heating and trimming inside it.\"}}\n  ]\n}\n<\/script><\/p>\n<p><script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"Article\",\n  \"headline\": \"A Foot Scan Device That Works Out of a Van: Running FMP Sessions on a Community Route\",\n  \"author\": {\"@type\": \"Organization\", \"name\": \"FOOTWORK LAB\", \"url\": \"https:\/\/footworklab.net\/\"},\n  \"publisher\": {\"@type\": \"Organization\", \"name\": \"FOOTWORK LAB\", \"url\": \"https:\/\/footworklab.net\/\"},\n  \"about\": {\"@type\": \"Thing\", \"name\": \"Mobile foot assessment\"},\n  \"mainEntityOfPage\": \"https:\/\/footworklab.net\/foot-scan-device-mobile-route\/\"\n}\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mobile screening routes: what a portable capture-and-customise set needs in a van, a community hall or a factory gate, and how a session is kept repeatable.<\/p>","protected":false},"author":1,"featured_media":4268,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[8],"tags":[],"class_list":["post-4740","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/footworklab.net\/fr\/wp-json\/wp\/v2\/posts\/4740","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/footworklab.net\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/footworklab.net\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/footworklab.net\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/footworklab.net\/fr\/wp-json\/wp\/v2\/comments?post=4740"}],"version-history":[{"count":1,"href":"https:\/\/footworklab.net\/fr\/wp-json\/wp\/v2\/posts\/4740\/revisions"}],"predecessor-version":[{"id":4741,"href":"https:\/\/footworklab.net\/fr\/wp-json\/wp\/v2\/posts\/4740\/revisions\/4741"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/footworklab.net\/fr\/wp-json\/wp\/v2\/media\/4268"}],"wp:attachment":[{"href":"https:\/\/footworklab.net\/fr\/wp-json\/wp\/v2\/media?parent=4740"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/footworklab.net\/fr\/wp-json\/wp\/v2\/categories?post=4740"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/footworklab.net\/fr\/wp-json\/wp\/v2\/tags?post=4740"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}